Energy Production
Game-changing advantages in location, labor and costs make Snyder the strategic choice for metal fabrication enterprise.
A LOCATION IN THE HEART OF
America’s leading
energy production
Opportunities are as big as the operations here. The Scurry Area Canyon Reef Operators (SACROC Unit) is one of the largest, oldest and most productive oil fields in the nation. Amazon Wind Farms, the fourth largest in the U.S., deploys more than 100 wind turbines in Scurry County capable of producing more than one million megawatt hours of wind energy annually to power Amazon’s operations. And Snyder provides low-cost ease of access to all of the Permian Basin, which accounts for over 43% of oil production within the U.S. and 15% of gas production.
A POWERFUL
Workforce development
Pipeline
Snyder’s workforce pipeline is as robust as our energy pipelines, starting with a high performing K-12 education system where P-TECH career paths include workplace experience and aligned programming that includes manufacturing and welding. High school students can graduate work-ready with certification or with an associate’s degree, and at Western Texas College students can also pursue welding training through a one-year certification or a two-year associate’s degree.
LOWER COSTS,
Targeted Incentives
Snyder supports enterprise success not only with lower costs in acreage, labor and energy but also with incentives at both the state and local level designed to speed ROI and support long-term growth.